Works On Site
Office Hours: 9:00AM - 4:00PM Monday to Friday (excl. Public Holidays)
Mobile: 0477 800 770
Email: manager@csy.apartments
Site Access:
-
Access to site must be pre arranged with the Building Manager otherwise you may be turned away on arrival.
-
All contractors must check in at the Buiding Manager's office on arrival and check out before leaving site.
-
All swipes and keys are to be returned before leaving site.
-
It is the contractors responsibility to confirm with Building Managment if a SWMS is required before attending site.
-
Contractors are required to report all safety issues to Building Management.
Parking on site:
-
All trucks must be under 3 metres high to access the loading bay or 2.1 metres to access the car park.
Lift Information:
-
Service Lift (Lift 1) Dimensions: 2900mm x 1450mm x 2100mm
-
Only the service lift should be used for moving materials or equipment.
-
Use of the service lift should be prearranged with the building manager.
Fire Services:
-
Is is the contractors responsibility to identify if isolation of fire services is required for the work they are conducting on while on site.
-
Isolation of fire services requires at least 72 hours notice.
-
Any costs related to activation of the fire system due to works conducted on site will be recovered from the responsible party.